News
Wilmington, Delaware, August 24, 2026: Electric Metals (USA) Limited (TSXV: EML; OTCQB: EMUS) (the “Company” or “Electric Metals“) today announced the launch of an integrated optimization program comprising multiple technical and engineering workstreams at its North Star Manganese Project in Minnesota (the “Project”), host to the highest-grade manganese deposit in North America.
The programs are designed to identify opportunities to improve ore selectivity and recovery, reduce material-handling and processing costs, optimize downstream plant design and advance the Project toward pre-feasibility. With several workstreams now underway in parallel, Electric Metals expects to report results progressively, creating multiple potential project cost savings and income-enhancing results through the balance of 2026 and into 2027.