Vancouver, B.C., November 12, 2026 – Storm Exploration Inc. (TSX-V: STRM) (“Storm” or the “Company”) today announces that it intersected disseminated and/or semi-massive to massive sulphide mineralisation in all eight holes drilled at the newly discovered mineralised VMS system of the company’s 100%-owned Gold Standard Project, located 60 km north of Fort Frances, Ontario, Canada.
“The lithologies, alteration and mineralisation observed in these drillholes confirm that a VMS system is the source of the 7 km-long corridor of conductive rocks at Gold Standard,” says Storm President and CEO Bruce Counts. “Based on these results, we are eager to assess the lateral and vertical potential of this extensive system and have commenced additional mapping and ground VLF on site in preparation for the resumption of drilling in the Q2/2027.”
