Vancouver, B.C., May 4, 2026 – Storm Exploration Inc. (TSX-V: STRM) (“Storm” or the “Company”) today announced its 2026 exploration plans for the Volcanogenic Massive Sulphide (“VMS”) target on its 100% owned Gold Standard Project located 60km north of Fort Frances in Northwestern Ontario, Canada.
Highlights
- 2026 field program and drilling planned:Storm plans ground geophysics, mapping, prospecting and soil sampling, followed by 10 to 15 core holes totaling 2,000m to 3,000m.
- Large VMS target:Gold Standard hosts a 5km-long conductivity anomaly identified by Storm in airborne survey data and interpreted as a potential VMS system.
- Drill-Confirmed Massive Sulphide Mineralization:4 holes drilled by Inco in 1969/1970 intersected significant sulphide mineralization, including Cu and Zn sulphides, over considerable lengths. All holes were less than 50m in length and no assays were completed.
- Gold-Copper Potential:Surface rock samples collected by Storm in 2022 near the HW-271 showing returned high-grade results, including up to 166 g/t Au, 197 g/t Ag and 1.47% Cu (see news release here).
