November 12, 2026 – Vancouver, BC – Bullfrog Gold Corporation (“Bullfrog Gold”) (TSX-V: FROG, OTCQB: BFROF) announces that drilling will commence at South Bullfrog focusing on the fully permitted Longtail and Shingleback targets (Figure 1). In addition, Bullfrog Gold will concurrently resume surface exploration on the seven existing target areas and the emerging Frogspawn target area northeast of SE Block (Figure 1). Bullfrog Gold is planning to deploy approximately 3,000 meters of diamond drilling at Longtail and Shingleback with a planned start date of November 28, 2026. Assay results for this drilling program are anticipated in Q1 2027.
Bullfrog Gold holds a 100% interest in the 10,050 acre South Bullfrog gold project located in the heart of the Beatty District in the Walker Lane Trend in Nevada, surrounded by AngloGold’s Bullfrog, North Bullfrog, and Arthur development projects
