Edmonton, Alberta (AB) — (January 21, 2026) – Torr Metals Inc. (“Torr” or the “Company“) (TSX-V: TMET.V) is pleased to report results from its Phase I 2,733 metre (m) drill program at the Bertha Target within the Company’s 332 km² Kolos Copper–Gold Project in south-central British Columbia. The program successfully confirmed the presence of a large, structurally-controlled hydrothermal copper-gold-silver system and, importantly, defined coherent geological and geophysical vectors toward a high-priority, untested copper–gold target to the northeast
